Completed Projects
We’ve been getting stuck in since the early eighties. Over that time we’re done hundreds of projects for hundreds of satisfied customers. Below is just a small selection of our work that we’re especially proud of. If you’d like to know more please get in touch we’d be happy to talk things through.
![](content/pics/60p2.jpg)
![](content/pics/61p12.jpg)
![](content/pics/62p27.jpg)
![](content/pics/110rp25.jpg)
Cambridge Bypass
Cambridge
Preliminary alignment investigations for Geotechnical Consultants. Subsequent drilling and instrument installations for Design & Build Contractor.
- HQ cored boreholes to 50m.
- SPT's at 1.5m centres.
- Standpipe installations.
- Shelby push tube samples.
- Heli portable drill rig.
- Tempory access bridges.
![](content/pics/132cp25.jpg)
![](content/pics/133cp26.jpg)
Dillmans Dam
Greymouth - South Island
Geotechnical Drilling for Liquifaction studies
- Completed Sonic drilling between 10-30m through Glacial Till
- 1m SPTs for liquifaction study
- PVC installed for Geophysical survey
- Completed under estimated time
![](content/pics/79p41.jpg)
![](content/pics/77p41.jpg)
![](content/pics/78p41.jpg)
WRK to WHK Pylon Drilling
Bay of Plenty
Preliminary alignment investigations for Geotechnical Consultants and Client.
- HQ cored boreholes.
- SPT's at 1.5m centres.
- Standpipe installations.
- Shelby push tube samples.
- Steep difficult access terrain.
- Multiple support Vehicles.
![](content/pics/75p56.jpg)
![](content/pics/74p56.jpg)
![](content/pics/72p56.jpg)
![](content/pics/76p56.jpg)
![](content/pics/73p56.jpg)
Southern Pipeline
Tauranga
Preliminary alignment investigations for Geotechnical Consultants and Client. Subsequent drilling and instrument installations for Design & Build Contractor.
- Over water drilling in tidal zones and deep water.
- Jack up barge.
- Spuded barge.
- Purpose built platforms.
- HQ cored boreholes to 70m.
- SPT's at 1.5m centres.
- Standpipe installations.
- Shelby push tube samples.
- CPTu testing, dissipation testing.
![](content/pics/68p22.jpg)
![](content/pics/109p38.jpg)
![](content/pics/66p54.jpg)
![](content/pics/67p11.jpg)
Hamilton Section / City Edge Alliance
Hamilton
Preliminary alignment investigations for Geotechnical Consultants and Client. Subsequent drilling and instrument installations for Design & Build Contractor.
- Purpose built platforms.
- Heli portable drill sites.
- HQ cored boreholes to 50m.
- SPT's at 1.5m centres.
- Standpipe installations.
- Vibrating Wire installations.
- Shelby push tube samples.
- CPTu testing, dissipation testing.
- sCPTu.
- sDMT.
- Electric Geonor Vane Testing, GVT.
- Concrete Pile evaluation with test boring.
![](content/pics/69p27.jpg)
![](content/pics/70p49.jpg)
![](content/pics/71p12.jpg)
Huntly Bypass
Huntly
Preliminary alignment investigations for Geotechnical Consultants and Client. Subsequent drilling and instrument installations for Design & Build Contractor.
- Colaboration and joint project co-operation with competitor drilling company.
- HQ cored boreholes to 70m.
- SPT's at 1.5m centres.
- Standpipe installations.
- Vibrating Wire installations.
- Shelby push tube samples.
- CPTu testing, dissipation testing.
- sCPTu.sDMT.
- Electric Geonor Vane Testing, GVT.
![](content/pics/63p4.jpg)
![](content/pics/64p16.jpg)
![](content/pics/65p25.jpg)
![](content/pics/111cp31.jpg)
Hairini Underpass
Tauranga
Preliminary alignment investigations for Geotechnical Consultants and Client. Subsequent drilling and instrument installations for Design & Build Contractor.
- High plubic presence and Cultural Significance
- Purpose built platforms.
- HQ cored boreholes to 50m.
- SPT's at 1.5m centres.
- Standpipe installations.
- Vibrating Wire installations.
- Shelby push tube samples.
- CPTu testing, dissipation testing.
- sCPTu.
- sDMT.
- Electric Geonor Vane Testing, GVT.